Capstone

FDE capstone projects and acceptance

Choose one of four teaching scenarios and complete requirements, blueprints, implementation, acceptance and retrospective. Review learning through five-stage artifacts and decision evidence.

What should an FDE capstone project deliver?

A reviewable capstone explains the customer problem, data and permission boundaries, implementation, actual check results and handover. Choose one of four teaching topics and organize evidence across five stages. Use fictional or synthetic data and start with a rule-based program; real model evaluation and production adoption require separate authorization and evidence.

Teaching example · fictional data

Project example: equipment maintenance tickets

Suppose a dispatcher needs to record faults and confirm assignments. Start with a checkable rule-based program: ticket titles cannot be empty and states follow agreed transitions. This example explains evidence preparation; it is neither a delivered client project nor a completed solution.

  1. Scope: define dispatcher, technician and approver responsibilities, inputs, data sources and excluded features. Mark unknown conditions explicitly.
  2. Implement: start with the module workbook and runnable lab. Keep before-and-after output and explain which failure each change addresses.
  3. Accept: cover a valid ticket, an empty title and an invalid state. Record expected and observed results, code version and unverified scope; do not prefill PASS.
  4. Hand over: document startup commands, failure observation, an owner and stop conditions. The capstone still requires an AI step, human boundaries and an evaluation set. The foundation path may analyze labeled synthetic records; rule tests are not real model evaluation.

Before starting

Complete preparation checks and six module exercises, keeping case decision notes. Use your own practice project and fictional data; do not connect real payments, customer production or unauthorized data. Experienced learners still provide artifacts and checks for each stage.

Review the curriculum and readiness →

Practice topics · choose one

  1. A

    Internal training system: courses, enrollment, instructor counts and administrative permissions.

  2. B

    Pet boarding platform: slots, deposits, merchant confirmation and booking conflicts.

  3. C

    Factory maintenance system: fault tickets, assignment, repair records and role boundaries.

  4. D

    Community group buying: campaigns, orders, inventory, settlement and reconciliation.

Required FDE evidence · check gaps before scoring

These requirements belong within the existing five stages, without extra points. Missing required evidence or unresolved red lines means incomplete/NEEDS_FIX; a total score alone cannot establish completed FDE delivery practice.

  1. Scoping and access (requirements: 20)

    Events, three stakeholder groups, source/access/approver/freshness/restriction inventory, scope and pause gates. Identify synthetic data or authorization; fictional clients must be labeled.

  2. AI step and human boundaries (blueprints: 20)

    Add classification, summarization or suggestions to a topic. Explain why AI is needed, a deterministic alternative, contracts and human confirmation. CRUD alone is insufficient.

  3. Implementation and reproduction (implementation: 30)

    Repository version, environment, four-part instructions, actual outputs and repairs. Build a reproducible software milestone before authorized model use; a rule example is not an LLM.

  4. Model evaluation and red lines (acceptance: 20)

    Per-case input, expectation, prohibition, actual output and decision; model/prompt/context/tool/dataset/judge versions and comparable baseline/candidate results. Red-line failures block release. The foundation-analysis path may use labeled synthetic records, without claiming real model evaluation.

  5. Handover and adoption plan (retrospective: 10)

    Independent successor reproduction, operation/recovery runbook, escalation owners and adoption users/tasks/window. Without observed adoption, submit a plan with blank results. Label self-rehearsal; independent handover remains unverified.

Distinguish two completion outcomes

Foundation path: synthetic scenarios, actual rule runs, analysis of given evaluation records and self-rehearsal form a foundation practice pack. FDE delivery capstone additionally requires authorized actual model runs, evaluation and independent handover review. Without these, report incomplete rather than inventing output or instructor grades. Neither is an industry credential or client production result.

Download artifact and review templates →

Five-stage analytic review · 100 points

Scores describe only the submitted evidence. A missing required gate means INCOMPLETE; any red-line failure means NEEDS_FIX. This site does not grade automatically or issue credentials.

  1. Requirements20 points

    Problem, ownership, scope, data permissions, stop conditions and a reasoned disagreement record.

    BandLevelAnchor
    18–20StrongScoping evidence is complete and reproducible; decisions stay within evidence.
    14–17ProficientScoping evidence covers the main requirements with only minor non-decisive gaps.
    10–13DevelopingScoping evidence is substantive but still lacks evidence, versions or boundaries.
    0–9Insufficient evidenceScoping evidence cannot be reviewed or claims beyond available evidence.
  2. Blueprints20 points

    Inputs, outputs, human review, permissions, interfaces, criteria and independently verifiable milestones.

    BandLevelAnchor
    18–20StrongBlueprints and contracts is complete and reproducible; decisions stay within evidence.
    14–17ProficientBlueprints and contracts covers the main requirements with only minor non-decisive gaps.
    10–13DevelopingBlueprints and contracts is substantive but still lacks evidence, versions or boundaries.
    0–9Insufficient evidenceBlueprints and contracts cannot be reviewed or claims beyond available evidence.
  3. Milestones and implementation30 points

    Four-part instructions, traceable version points, actual commands and outputs, repairs and critical-behavior tests.

    BandLevelAnchor
    27–30StrongImplementation evidence is complete and reproducible; decisions stay within evidence.
    21–26ProficientImplementation evidence covers the main requirements with only minor non-decisive gaps.
    15–20DevelopingImplementation evidence is substantive but still lacks evidence, versions or boundaries.
    0–14Insufficient evidenceImplementation evidence cannot be reviewed or claims beyond available evidence.
  4. Acceptance and quality20 points

    Case provenance, version variables, routine and red-line results, affected regression and release decision.

    BandLevelAnchor
    18–20StrongEvaluation evidence is complete and reproducible; decisions stay within evidence.
    14–17ProficientEvaluation evidence covers the main requirements with only minor non-decisive gaps.
    10–13DevelopingEvaluation evidence is substantive but still lacks evidence, versions or boundaries.
    0–9Insufficient evidenceEvaluation evidence cannot be reviewed or claims beyond available evidence.
  5. Handover and retrospective10 points

    Independent reproduction, recovery and escalation, adoption plan, observed-result boundaries and next improvements.

    BandLevelAnchor
    9–10StrongHandover and retrospective is complete and reproducible; decisions stay within evidence.
    7–8ProficientHandover and retrospective covers the main requirements with only minor non-decisive gaps.
    5–6DevelopingHandover and retrospective is substantive but still lacks evidence, versions or boundaries.
    0–4Insufficient evidenceHandover and retrospective cannot be reviewed or claims beyond available evidence.

Five non-compensable gates

Prepare your practice pack

Keep the pack in your repository or an agreed learning space. If no architecture drift occurred, report that rather than manufacturing failure. Fill evidence gaps without lowering criteria. Training inquiries can discuss learning or team review arrangements; an inquiry is not enrollment or certification.